Skip to content
EN | DE

cFos Power Brain Solar

S0 meters must be configured separately as charge meter. Phase switching is only available with the Solar variant and must be enabled by the user:

  1. Home -> disable Load Balancing (Monitoring Mode)
  2. Configuration -> Hardware - Phase switch / Relais 2 (enable phase switching)

Supported features

  • mA regulation: Finer charging current regulation (mA instead of A) for better solar surplus use.
  • RFID: Integrated RFID card reader for vehicle identification.
  • 1P/3P: Automatic phase switching. Useful for solar surplus charging.

Parameters

NameDescriptionValueLevel
hostIP address or hostname
Example: 192.0.2.2
optional
Configuration example for evcc.yaml

If you don't want to configure via the UI, you can alternatively use this YAML block.

chargers:
- name: my_charger
type: template
template: cfos
host: 192.0.2.2 # IP address or hostname